Development of An Optimal Production Scheduling System with Multi-goals
- Received Date: 1998-01-05
- Rev Recd Date: 1998-03-05
- Publish Date: 1998-06-15
-
Key words:
- sequencing /
- schedulling /
- optimization /
- heuristic algorithm
Abstract: This paper presents the structure and main functions of an optimal production scheduling system with multi-goals.How the system combines a multi-goals optimal heuristic algorithm with a simulation model and workingday assignment procedure to implement establishing,modifying and resequening of an optimal production schedule plan dynamically and rapidly is also analyzed in this paper.
Citation: | Lü Shaoyi, Liu Zhimin, Liu Fuyan. Development of An Optimal Production Scheduling System with Multi-goals[J]. Journal of University of Electronic Science and Technology of China, 1998, 27(3): 316-320. |